World Class Projects


Mirant Mid Atlantic
Chalk Point Limestone Handling System



Engineering, procurement, and construction assistance of limestone handling for flue gas desulfurization (FGD) systems. The limestone is received by either truck or railcar at the combined receiving hoppers. Each receiving hopper has dual drag chain feeders at 200 TPH capacity to feed the unloading conveyors. The limestone is conveyed at 400 TPH through the unloading transfer stations to enclosed storage structures and stockpiles with telescopic chutes. The storage structures include a 9,000 and 18,000 ton dome. The limestone is conveyed to the limestone preparation buildings and discharges to silos.

Back to Projects


  • CONTACT US: