Engineering, procurement and construction services to modify P&M’s existing Elkol tipple near Kemmerer, Wyoming. Under severe physical and operating conditions the load-out tipple was modified to add ASTM sampling system to the station, and a certified belt scale. The addition was accomplished through major modifications to the existing chute work, adding two belt conveyors and extensive changes to the structure.
Back to Projects