Elkol Tipple Upgrade



Engineering services and equipment procurement were provided for a new truck dump, crushing, conveying, rail and truck loadout systems to upgrade aging facilities. Design throughput is 750 TPH. Major components of the work included the following:

• New truck dump with dust stilling shed (end dump mine haul trucks)
• Feeder/breaker
• Transfer conveyor to crushing station
• Crushing station with double-roll crusher
• Sample system with sweep sampler, feed and reject conveyors, crusher and rotary sample collector
• Transfer conveyor to rail loadout station
• Rail loadout station with control cab and flop gate
• Transfer conveyor to truck loadout silos
• Modification at roof of existing loadout silos to receive new transfer conveyor
• New shuttle conveyor at roof of existing loadout silos