John W. Turk Power Plant



Engineering, procurement and construction assistance of the coal handling system from the coal receiving rail dump hoppers to the coal bunkers in the boiler building. The conveying system is designed to receive coal at the rotary car dumper. The received coal is transferred from the unloading hopper to the unloading conveyor by two variable speed belt feeders. The coal is then transferred to storage. Reclaimed from the two storage piles by two variable rate rotary plow feeders and through the central transfer tower to the crusher tower. The coal is crushed with two 950 TPH crushers before being transferred on the plant feed conveyor to the silos at the power plant. The six silos in a single row are fed by a single conveyor with traveling tripper.