World Class Projects


Norfolk Southern Railway
Kopperston



Engineering, design, procurement and construction management of an overland coal transportation system at the Norfolk Southern Harris Mine facility. The project included a reclaim tunnel under the existing storage pile and three conveyors totaling 3,200 feet feeding a 3.9 mile overland conveyor. The overland conveyor has two miles of elevated trusses. Nearly a half million cubic yards of earth were excavated to prepare the site for the conveyor route. Two 12,000 ton capacity slip form silos (70’ x 182”) were also included in the scope of work. A single reclaim conveyor from both silos feeds a new train loadout structure built over the existing Norfolk Southern tracks.